Fleets and destinations

    Depot charging for electric fleets

    Independent depot charging consulting for UK fleets and multi-site operators: grid capacity, specification, tender and rollout, delivered against the constraints nobody plans for. No hardware or installer commission, so the specification serves the fleet rather than the supplier.

    Depot charging problems I get called about

    You have an electrification mandate and no plan

    A vehicle order date exists, the depots are not ready, and nobody internally owns the charging side.

    Grid capacity is the unknown

    You do not know what each site can actually take, and the DNO process has already started slipping the programme.

    Quotes are impossible to compare

    Every installer has quoted a different specification, so price comparison is meaningless and risk is invisible.

    Multi-site rollout with no standard

    Each depot has been done differently, so nothing is repeatable and operations carries the variance.

    Depot charging support, from requirements to rollout

    Requirements before hardware

    Duty cycles, dwell times and depot layout first. The kit list comes last, not from a supplier's brochure.

    Grid and capacity reality

    Site-by-site capacity assessment and DNO engagement, so the programme plan reflects connection timelines rather than hope.

    Standardised specification and tender

    One specification across the estate, tendered competitively, so quotes are genuinely comparable.

    Rollout and handover

    Delivery oversight through to commissioning evidence, operational handover and the O and M arrangement that keeps uptime honest.

    How much will depot charging cost your fleet?

    Depot charging cost depends less on the chargers than on civils, cabling distance and whether the grid connection needs reinforcement. Answer eight questions about your vehicles, sites and charging window and the depot cost estimator gives you a first-pass cost range, a timeline band and the risks most likely to move the number, before you speak to a single supplier.

    Estimate your depot charging cost

    How a depot charging programme runs

    1. Week 0

      Intro call

      A 30-minute call on fleet size, depot count and the date you are working back from.

    2. Weeks 1 to 4

      Requirements and capacity

      Duty cycle analysis, site surveys and capacity assessment across the priority depots.

    3. Weeks 4 to 10

      Specification and tender

      One standard specification, competitive tender, and a recommendation with the risks named.

    4. Ongoing

      Rollout

      Delivery oversight depot by depot, with commissioning evidence and operational handover at each site.

    100,000+

    EV charging installations influenced

    15+ years

    In UK charging and fleet electrification

    Founder

    Of ChargedEV, built and exited

    Board level

    NED and fractional engagements

    Engagement models

    ModelCommitmentBest forWhat you get
    Depot feasibility2 to 4 weeksOne site, unknown capacityCapacity read, options and indicative cost
    Estate assessmentFleet and Depot Strategy from £8,750 See pricing6 to 12 weeksMulti-site fleets with a mandatePrioritised depot plan and standard specification
    Procurement support6 to 10 weeksQuotes you cannot compareTender, evaluation and recommendation
    Rollout oversightOngoingDelivery already underwayProgramme governance and commissioning assurance
    See all pricing

    Current availability

    Available for depot programmes starting this quarter

    Multi-site rollouts are scoped depot by depot so the first sites prove the specification.

    Depot charging questions

    Go deeper

    EV procurement

    Specification, tender and supplier selection for what you are buying.

    See the pillar

    Installer networks

    The delivery capability behind every depot programme.

    See the pillar

    Depot cost estimator

    A first-pass view of what a depot programme is likely to cost.

    Run the numbers

    Depot discovery checklist

    The questions to answer on power, civils, vehicles and contracts before you commit to dates.

    Download the checklist

    Fleet readiness score

    Score how ready your fleet and depots really are before committing to dates.

    Score your fleet

    Fleet depot infrastructure

    A case study on delivering depot charging across a national estate.

    Read the case study

    Proof this works

    Recent engagements closest to this kind of work.

    Fleet depot infrastructure

    Grid constraints mapped early, so the depot build was phased instead of stalled.

    Read the case study

    Destination charging rollout

    Site by site cost and sequencing plan that kept the rollout on budget.

    Read the case study

    Get a straight read on your depots

    Thirty minutes on fleet size, depot count and timing. You will leave knowing which constraint is going to set your programme dates.

    Book a call