Lessons from across the pond: what the UK can teach the US about public, fleet and depot charging, and what it can't

    Mark Pymm, Founder, WattsUp Consulting5 min read

    I've been to the EV Charging Summit in Las Vegas for the last three years. Every year someone asks me whether the UK is ahead of the US. The honest answer is: in some things, yes. In others we're just different, and pretending otherwise is how UK companies come unstuck over there.

    The first thing to get straight is where the opportunity is. A big slice of the UK market grew up around home charging. In the US, the business opportunity for most companies sits in public fast charging, fleet and depot, and workplace charging. So that's where these lessons start.

    1. Reliability gets regulated, so get ahead of it

    The UK made reliability law. Under the Public Charge Point Regulations 2023, an operator's rapid network has to be 99% reliable on average, with contactless payment and a free 24/7 helpline. In the US, federally funded sites already need 97% uptime per port, and the national fast-charging reliability score sat at 93.9 in Q3 2026, according to Paren. Drivers don't care whose fault a broken charger is. Build operations and maintenance properly now and you're ahead of the rules and the reviews.

    2. The grid is the critical path, not the charger

    In the UK, a depot grid connection typically takes 18 to 36 months to build. In the US, upgrades for large fleet sites can take years in constrained areas. You can get trucks in weeks. You can't get megawatts in weeks. The lesson from the UK is to talk to the network operator before you order vehicles, and to size the connection from real duty cycles and dwell times, not worst-case guesses. Managed charging and on-site storage can buy you capacity while you wait.

    3. Fleet charging happens in three places

    Depot, public and the driver's driveway. UK fleets learned that all three have to be planned together: who owns a charger at an employee's home, how the energy gets reimbursed, who maintains it, and who gets the value from smart charging. It's the one place my home charging background matters most in the US: take-home vans and fleet drivers.

    4. Installer and contractor quality at volume

    Whether it's a depot, a car park or a driveway, someone has to survey it, install it, commission it and hand it over properly. When demand spikes, quality drops. The fix isn't glamorous: vetted networks, standard processes, proper training and real feedback. In the US, that also means teams with EVITP certification for federally funded work.

    5. Headcount isn't a growth metric

    Too many charging businesses treat hiring as proof they're growing. Keep build-out lean, separate construction from operations and maintenance, and use partners for the peaks. Some of the most productive delivery teams I know are tiny.

    6. Propositions beat products

    A charger isn't a proposition. A software platform isn't a proposition. A fleet manager, a site host and a driver each want something different. The best results I've seen came from cutting a long list of offers down to two or three, each aimed at a buyer who actually buys.

    What about home charging?

    Most US charging still happens at home, about 86% according to J.D. Power. But a lot of it has been plug-in: a standard 120-volt cable, or a portable unit on a NEMA 14-50 outlet. That's changing. More owners with a driveway are moving to permanently mounted, hardwired Level 2 chargers, which means a qualified electrician, a permit and a proper install. Qmerit says 70% of its installations use a 48-amp charger, which has to be hardwired. That's where UK experience of home installs at volume (survey, quality, fulfilment, OEM and dealer partnerships) becomes useful. It's a growing part of the US story, not the headline.

    What doesn't transfer

    • There are around 3,200 US utilities, each with its own interconnection process and tariffs.
    • Demand charges can make up a big share of the running cost of fast chargers and depots.
    • Federally funded sites carry Buy America, uptime and EVITP requirements.
    • Permitting and contractor licensing change from state to state, sometimes city to city.
    • Site and real estate economics don't translate.
    • Employment norms, benefits and non-competes are a different world.

    The takeaway

    If you're a UK or European business looking at the US, don't arrive with a UK case study and expect it to land. Lead with the commercial segments, pick the lessons that fit, adapt the rest, and build your partners before you need them. And if you're a US business scaling public, fleet or depot charging, some of our mistakes might save you a few of yours.

    If any of this is live for you, book a call. And if you're at the EV Charging Summit in Las Vegas in March, come and find me.